06/30/2011: Fixed vantage point. View facing North towards Park |
06/02/2011: Rotunda plaza planter and deck layout
|
|
|
06/16/2011: P2 Level Parking underground |
06/16/2011: Watch commanders station |
|
|
06/22/2011: Interior Stair 3 |
06/24/2011: Police Officers Gym Equipment
|
|
|
05/31/2011: Fixed vantage point. View facing North towards Park |
05/19/2011: Lobby epoxy coating on floor with terrazzo metal strps
|
|
|
05/19/2011: Lunch room L3 ceiling soffit |
05/19/2011: L2 interior office space before partitions |
|
|
05/13/2011: Forming the raised planter south of the rotunda |
05/05/2011: View of the south plaza deck from inside lobby at rotuda
|
|
|
04/30/2011: Fixed vantage point. View facing North towards Park |
04/28/2011: Holding cell entrance at booking area
|
|
|
04/28/2011: Forming the site work, planters and stairs |
04/22/2011: Ceiling system for L2 conference room |
|
|
04/13/2011: South west side solar panels installed on shade trellis |
04/13/2011: Stamping and finishing the pavement on Park Ave
|
|
|
03/31/2011: Fixed vantage point. V iew facing North towards Park |
03/31/2011: K type fixtures at rotunda ceiling
|
|
|
03/31/2011: Cabinet installation at level 2 |
03/23/2011: Rotunda K type light fixtures and interior stone installed |
|
|
03/23/2011: Tactical Operations Dispatch Room at the Communications Center |
03/23/2011: South West entrance to P2
|
|
|
02/28/2011: Fixed vantage point. View facing North towards Park |
02/04/2011: View from under stair 1 to lobby ceiling
|
|
|
02/04/2011: Interior lobby stair 1 installation starts |
02/04/2011: Rotunda citadel panels being installed |
|
|
02/04/2011: Sun shade installed over windows |
02/01/2011: Rotunda scaffolding coming down
|
| |
|
01/31/2011: Fixed vantage point. View facing North towards Park |
01/27/2011: Building sign on the North West side of the building
|
|
|
01/27/2010: South P2 garage ramp trellis |
01/27/2010: Lunch room ceiling 01/27/2010: Pumps for the boilers |
|
|
|
01/27/2010: Locker installation
|
|
 |
12/30/2010: Fixed vantage point. View facing North towards Park |
12/30/2010: Level 3 Metal panels outside the laboratory space
|
|
|
12/30/2010: Driveway A and the south western corner of the building |
12/15/2010: South side of the building showing the Citadel Panel |
|
|
12/09/2010: View of the L1 north entrance from the L1 parking deck |
11/27/2010: North West Aerial View of the building taken by helicopter
|
|
 |
11/30/2010: Fixed vantage point. View facing North towards Park Avenue |
11/30/2010: South east of rotunda, deck retaining wall and footing
|
|
|
11/24/2010: Restroom wall tile |
11/24/2010: North entrance to the IT room from the L1 deck |
|
|
11/10/2010: Fine grading/base for the south parking lot |
11/02/2010: Trellis with yellow primer and finish champagne color
|
|
|
10/31/2010: Fixed vantage point. View facing North towards Park |
10/28/2010: Overview. View facing North towards Park
|
|
|
10/18/2010: Trellis at South side over P2 exterior ramp |
10/04/2010: Metal panel at the level 3 North East corner at exterior of building |
|
|
10/04/2010: Metal panel at the level 3 North East corner at exterior of building |
10/12/2010: Plaster at South side exterior of building
|
|
|
09/30/2010: Fixed vantage point. View facing North towards Park Ave |
09/30/2010: Blue metal panels installed on the South West corner
|
|
|
09/28/2010: Exterior rough grading |
09/24/2010: Pumps on the low roof next to the boilers |
|
|
09/21/2010: Air Handling Units on the low roof |
09/07/2010: Rotunda Parapet wall framing
|
|
|
08/31/2010: Fixed vantage point. View facing North towards Park Ave |
08/26/2010: Interior of rotunda lobby showing metal stud wall
|
|
|
08/26/2010: Fan P2 |
08/20/2010: Pumping concrete for mechanical curbs |
|
|
08/10/2010: HVAC and piping at control room |
08/10/2010: Backfilling the water pipe trench on Driveway A
|
|
|
07/30/2010: Fixed vantage point. View facing North towards Park Avenue |
07/29/2010: Level 2 metal stud and drywall
|
|
|
07/23/2010: Scaffolding at Rotunda, view from inside the lobby |
07/23/2010: Photo Votaic Trellis on Level 1 |
|
|
07/23/2010: Metal Stud framing Level 1b |
07/01/2010: Delivery of the 1000 KVA emergency generator
|
|
|
06/21/2010: Interior Stair #3 |
6/30/2010: Fixed vantage point. View facing North towards Park |
|
|
06/16/2010 Trellis for the photovoltaic panels L1 |
06/16/2010: Interior drywall and ducting L1 |
|
|
06/02/2010: Underside of the entry rotunda |
06/11/2010 Entry ramp down to the P2 level parking space
|
|
|
05/13/2010 Permanent interior stairs |
5/28/2010: Fixed vantage point. View facing North towards Park Avenue |
|
|
05/13/2010 Permanent interior stairs |
05/18/2010 Fireproofing the structural steel Level 1 |
|
|
05/10/2010: View of rotunda underside of decking
|
05/07/2010: Level 2 deck pour view from the East side |
|
|
04/30/2010: Start install of rebar on L2 Deck |
4/30/2010: Fixed vantage point. View facing North towards Park A
|
|
|
04/21/2010: Ceremonial beam installed on west side of building ` |
04/21/2010: Topping off ceremonial beam being hoisted into place |
|
|
04/06/2010: Loading Metal Decking for L2, L3 and Roof |
04/06/2010: Structural Steel going up West side of building
|
|
|
03/31/2010: Fixed vantage point. View facing North towards Park Ave |
03/23/2010: Metal Decking between the walls of the firing range roof
|
|
|
03/18/2010: Placing the second precast beam into place at the
North East side of the building |
03/11/2010: Firing Range Roof Rebar installs |
|
|
03/10/2010: Concrete pumping L1C Cast in place slab |
03/09/2010: Waterproofing west side of building
|
|
|
02/26/2010: L1B Concrete Pour. The firing range roof was poured with L1A concrete pour |
02/26/2010: Backfill and Compaction on the East side of the building
|
|
|
02/23/2010: Rebar, conduit and sleeves for the electrical switchgear room floor |
02/16/2010: Scaffolding and Forming the CIP deck on L1C Area |
|
|
02/16/2010: Close up of the concrete, crew, controller, nspector &
supervisor. Quality control is critical in forming the concrete slope to
drain |
02/01/2010: View of the clear blue sky from the underground firing
range mechanical room
|
|
|
01/27/2010: Scaffolding deck for L1 Cast in place slab |
01/25/2010: Forming the exterior wall P1
|
|
|
01/19/2010: East P1 Exterior Wall |
01/11/2010: P1 TS-B topping slab pour
|
|
|
01/07/2010: P1 TS-A topping slab pour |
01/13/2010: Backfilling around the P2 south west exterior wall
|
|
|
12/09/2009: Beam and Column Rebar |
12/08/2009: Pour P1A for the P1 cast in place
deck
|
|
|
12/09/2009: Forming the walls of the firing range |
12/09/2009: Rebar and Decking for the P1B part
of the CIP deck
|
|
|
12/09/2009: Beam and Column Rebar |
12/08/2009: Pour P1A for the P1 cast in place
deck
|
|
|
11/30/2009: Fixed vantage point. View facing
North towards Park Ave. |
11/30/2009: Install of the scaffolding for the
P1 CIP Deck
|
|
|
11/30/2009: South P2 wall at the entrance to parking level 2 |
11/30/2009: Rebar installation in the P1A portion
of the cast in place deck |
|
|
11/30/2009: Forming & pouring internal shear
walls |
11/30/2009: Waterproofing on P2 level Exterior
East Wall |
|
|
10/28/2009: Level P2-Finishing Concrete Pour |
10/24/2009: Level P2-Second Saturday Concrete
Pour
|
|
|
10/17/2009: Level P2- First Saturday Concrete
Pour |
10/17/2009: Level P2- First Saturday Concrete
Pour
(Lt. to Rt.) Doug
Zieman, Chief Pat Sprecco,
Bill Cooley, Joe DeMello, Lt. Ron Smithson |
|
|
10/14/2009: Level P2-Laying steel rebar from
East to West |
10/01/2009: Level P2-Waterproofing and rebar at
Tower Crane Base,
Sump Pumps and Elevator Pits
No. 1 & 3 |
|
|
09/25/2009: Tower Crane Base Near Elevator
No. 3 |
09/29/2009: Under Slab Waterproofing Sheets
. |
|
|
09/24/2009: Brick Veneer Mock-Ups |
09/24/2009: Drilling Elevator Bores (No. 1 & 3) |
|
|
09/09/2009: SDNHM – Historic Artifact Recovery
during Well Excavation |
09/18/2009: Mat Slab Edge Forms |
|
|
08/25/2009: Excavation of the site |
08/21/2009: Hauling of the Dirt |
|
|
08/25/2009: Workers at the site |
08/21/2009: Digging the Hole |
|
|
08/13/2009: Major earthwork starts on site “Big Dig” |
8/07/2009: Dewatering well drilling |
|
|
07/15/2009
City striping Rea Temporary
Parking Lot |
07/28/2009: Temp Lot & ADA Ramp Site walk |
|
|
07/09/2009: NW - Magnolia Ave. Temp Lot
laying asphalt |
07/09/2009: NE - Rea Temp Lot laying asphalt |