07/30/2010: Fixed vantage point. View facing North towards Park Avenue |
07/29/2010: Level 2 metal stud and drywall
|
|
|
07/23/2010: Scaffolding at Rotunda, view from inside the lobby |
07/23/2010: Photo Votaic Trellis on Level 1 |
|
|
07/23/2010: Metal Stud framing Level 1b |
07/01/2010: Delivery of the 1000 KVA emergency generator
|
|
|
06/21/2010: Interior Stair #3 |
6/30/2010: Fixed vantage point. View facing North towards Park |
|
|
06/16/2010 Trellis for the photovoltaic panels L1 |
06/16/2010: Interior drywall and ducting L1 |
|
|
06/02/2010: Underside of the entry rotunda |
06/11/2010 Entry ramp down to the P2 level parking space
|
|
|
05/13/2010 Permanent interior stairs |
5/28/2010: Fixed vantage point. View facing North towards Park Avenue |
|
|
05/13/2010 Permanent interior stairs |
05/18/2010 Fireproofing the structural steel Level 1 |
|
|
05/10/2010: View of rotunda underside of decking
|
05/07/2010: Level 2 deck pour view from the East side |
|
|
04/30/2010: Start install of rebar on L2 Deck |
4/30/2010: Fixed vantage point. View facing North towards Park A
|
|
|
04/21/2010: Ceremonial beam installed on west side of building ` |
04/21/2010: Topping off ceremonial beam being hoisted into place |
|
|
04/06/2010: Loading Metal Decking for L2, L3 and Roof |
04/06/2010: Structural Steel going up West side of building
|
|
|
03/31/2010: Fixed vantage point. View facing North towards Park Ave |
03/23/2010: Metal Decking between the walls of the firing range roof
|
|
|
03/18/2010: Placing the second precast beam into place at the
North East side of the building |
03/11/2010: Firing Range Roof Rebar installs |
|
|
03/10/2010: Concrete pumping L1C Cast in place slab |
03/09/2010: Waterproofing west side of building
|
|
|
02/26/2010: L1B Concrete Pour. The firing range roof was poured with L1A concrete pour |
02/26/2010: Backfill and Compaction on the East side of the building
|
|
|
02/23/2010: Rebar, conduit and sleeves for the electrical switchgear room floor |
02/16/2010: Scaffolding and Forming the CIP deck on L1C Area |
|
|
02/16/2010: Close up of the concrete, crew, controller, nspector &
supervisor. Quality control is critical in forming the concrete slope to
drain |
02/01/2010: View of the clear blue sky from the underground firing
range mechanical room
|
|
|
01/27/2010: Scaffolding deck for L1 Cast in place slab |
01/25/2010: Forming the exterior wall P1
|
|
|
01/19/2010: East P1 Exterior Wall |
01/11/2010: P1 TS-B topping slab pour
|
|
|
01/07/2010: P1 TS-A topping slab pour |
01/13/2010: Backfilling around the P2 south west exterior wall
|
|
|
12/09/2009: Beam and Column Rebar |
12/08/2009: Pour P1A for the P1 cast in place
deck
|
|
|
12/09/2009: Forming the walls of the firing range |
12/09/2009: Rebar and Decking for the P1B part
of the CIP deck
|
|
|
12/09/2009: Beam and Column Rebar |
12/08/2009: Pour P1A for the P1 cast in place
deck
|
|
|
11/30/2009: Fixed vantage point. View facing
North towards Park Ave. |
11/30/2009: Install of the scaffolding for the
P1 CIP Deck
|
|
|
11/30/2009: South P2 wall at the entrance to parking level 2 |
11/30/2009: Rebar installation in the P1A portion
of the cast in place deck |
|
|
11/30/2009: Forming & pouring internal shear
walls |
11/30/2009: Waterproofing on P2 level Exterior
East Wall |
|
|
10/28/2009: Level P2-Finishing Concrete Pour |
10/24/2009: Level P2-Second Saturday Concrete
Pour
|
|
|
10/17/2009: Level P2- First Saturday Concrete
Pour |
10/17/2009: Level P2- First Saturday Concrete
Pour
(Lt. to Rt.) Doug
Zieman, Chief Pat Sprecco,
Bill Cooley, Joe DeMello, Lt. Ron Smithson |
|
|
10/14/2009: Level P2-Laying steel rebar from
East to West |
10/01/2009: Level P2-Waterproofing and rebar at
Tower Crane Base,
Sump Pumps and Elevator Pits
No. 1 & 3 |
|
|
09/25/2009: Tower Crane Base Near Elevator
No. 3 |
09/29/2009: Under Slab Waterproofing Sheets
. |
|
|
09/24/2009: Brick Veneer Mock-Ups |
09/24/2009: Drilling Elevator Bores (No. 1 & 3) |
|
|
09/09/2009: SDNHM – Historic Artifact Recovery
during Well Excavation |
09/18/2009: Mat Slab Edge Forms |
|
|
08/25/2009: Excavation of the site |
08/21/2009: Hauling of the Dirt |
|
|
08/25/2009: Workers at the site |
08/21/2009: Digging the Hole |
|
|
08/13/2009: Major earthwork starts on site “Big Dig” |
8/07/2009: Dewatering well drilling |
|
|
07/15/2009
City striping Rea Temporary
Parking Lot |
07/28/2009: Temp Lot & ADA Ramp Site walk |
|
|
07/09/2009: NW - Magnolia Ave. Temp Lot
laying asphalt |
07/09/2009: NE - Rea Temp Lot laying asphalt |